Introduction
The notes below relate to the supply and electrical power transmission system in the UK. The notes are outline in nature and are intended
to provide a general background sufficient for a mechanical engineer to have an awareness of the electrical power supply system as used in the UK
The high-voltage electric power transmission is called the National Grid and transfers the power which is generated in the power stations: [coal , gas, nuclear, hydroelectric, etc ] to
local substations which supply power at lower voltages to the various users :[commercial, industrial, domestic ] in the United Kingdom.
There are also High- Voltage-Direct-current undersea supply lines form/to northern France (HVDC Cross-Channel)and Northern Ireland (HVDC Moyle).
The power transferred in an electrical transmission line directly related to the (voltage2 / resistance ) = E2/R
The power loss in a conductor is the Current2 x Resistance = I2.R. Therefore for maximum efficiency of power transmission
the electrical power should be transferred at the highest voltage and the lowest current.
In the United Kingdom a range of specific voltages have been adopted to cover adequately various levels of power transmission.
Power stations generators produce electricity at 25kV and 33KV. The generator output voltages are stepped up, using
transformers, for efficient transmission through the National Grid cables, to voltages of 400kV, 275kV and 132kV.
The parts of the system carrying electrical supplies at voltages in excess of 200kV are called the Super grid.
There is also a High-Voltage-Direct-current undersea supply lines form/to northern France (HVDC Cross-Channel).
The undersea section consists of eight 29 mile long 270 kV submarine cables, between Folkstone (UK) and Sangatte (France).
The UK power transmission systems also includes other lower duty HVDC links.
The local transmission voltages to industrial commercial and domestic users include 11 kV, 33 kV, 66 kV.
UK Electrical Power Supply and consumption
At the present time the available UK power generation capacity is about 78GW not including a large number
of minor generation facilities e.g. small hydroelectric generators, solar panels , factory based diesal generators etc. (Tables showing
the capacity are provided at the foot of this webpage). This capacity is used to meet the ongoing national demand.
This demand, normally, varies on a continuous basis over a 24 hour cycle between a maximum of about 42 GW and a minimum of about 22 GW.
(See chart below).
However there significant variations on this pattern with peaks of up the 54GW at times when a large percentage of the population
carry out a loading event at the same time and in times of adverse weather. The generation capacity is also not constant e.g. power
stations shut down due to plant failure or maintenance : windpower farms lose their generation capacity when there is no wind.
There are also significant power losses due in the transmission of the power from the generators to the suppliers.
The control of the supply network is therefore critical and it is often necessary to import power from France via the HVDC link
Cost of Power Genration in UK
The selection of the electic supplies to the national grid is organised on a basis of availability and cost.
The cost of power generation is extremely difficult to estimate as there are a large number of variables including , fuel cost, capital cost,
operating cost, decommssioning costs, costs of generation back-up etc etc. An estimate of the current prices are required to
allow the grid controllers to select which suppliers provide the current loading. It is also necessary to have an estimate of
the lifetime costs of future generation to allow investment in new power stations. Below are tables showing estimated
costs for existing facilities and for new facilities.
Important Note: these are indicative and are only useful for comparing costs in the same table. the two tables
are based on information from different sources produced at different dates. The souces also use very different accountancy methods.
Please refer to the linked reports for quality
information.  
Indicative Base line operation with no CO2 removal costs included (2004 values)
Important Note: The report from which these costs has been extracted was issued in 2004. The fuel costs have risen dramatically since
that time i.e coal costs have increased by about 300% and gas costs have increased by at least 200%. The table should therefore
only be used as a guide to indicative relative costs , as noted above.
Technology |
Operating Cost pence/kWh |
Coal -fired PF | 2,5 |
Coal fired CFBC | 2,6 |
Coal Fired IGCC | 3,2 |
Gas Fired OCGT | 3,1 |
Gas Fired CCGT | 2,2 |
Nuclear | 2,3 |
Onshore Wind + Back-up | 5,4 |
Offshore Wind + Back-up | 7,2 |
Note: If gas OCGT is operated on a peaking cycle the costs rise to 6,2 pence/kVh
The Cost of Generating Electricity Royal Academy of engineering
PF=pulverised coal.
CFBC=Circulating fluidised bed combustion
CCS=Carbon capture and storage;
FGD=flue gas desulphurisation;
IGCC=integrated gasification combined cycle;
OCGT=open cycle gas turbine;
CCGT=combined cycle gas turbine;
Indicative - Generation costs for New plant (2010).
Technology |
Operating Cost pence/kWH |
Coal with CO2 capture | 10-15,5 |
Natural gas turbines with CO2 capture | 6-13 |
Natural gas turbine, no CO2 capture | 5,5-11 |
New nuclear | 8-10,5 |
Onshore wind | 8-11 |
Solar farms | 12,5-18 |
Offshore wind | 15-21 |
Tidal power | 15,5-39 |
Biomass | 6-12 |
UK Electricity Generation Costs Update Mott Macdonald Report
There is little information available for Hydro-Electric generation costs. I believe that the costs/KWh is
comparable to conventional to coal/gas. However there is very little scope for developing new facilities in the UK and the existing
larger faciliities are primarily pumped storage systems which are used to allow, low cost, continuous base load operations on
other power generation types.
Electrical Power Suppliers
Most of the electrical power supplied to the National Grid is from turbine driven generators located
at Coal, Nuclear , Gas, or Oil powered stations.
There is also considerable renewable energy capacity in place in the UK including bio-mass power generation, hydro-electric generation
and a considerable number of wind power farms.
The larger power stations have a number of turbines generating voltages about 33kV . Each generator supplies to the grid via
switches and step up transformers. The switches would typically consist of three oil filled cylindrical tanks, one for each phase,
each with two insulators on the top to carry the input and output lines. At one end would be a box containing the gear to operate
the mechanical switches inside the oil-filled tanks. The Transformers are generally oil cooled and step up the voltage to 275kV or
400kV. The oil cooling system may include a recirculating system with the oil transferred through large radiator units. The generators output could also be used at lower voltages to power electrical equipment at the power stations.
Different types of power stations have different performance criteria. Nuclear power stations need to be operated
continuously providing a base load. Coal powered stations also are most efficient when operated fairly continuously. Gas powered
power stations can be reasonably quickly started and shut down. Diesel Generators have limited capacity but are able to be started and stopped
very quickly. Diesel generators are the primary sources of power for small companies either as back up to the grid or in many cases
as the primary source of power to drive large machines. The wind power generators supply energy continuously when the wind force and direction
are favorable. Hydro electric storage generators are very useful for balancing the supply with the demand.
There are a number of Hydro-electric power stations, the majority of which, are located on
the scottish lochs. The larger ones (over 1 MW) are listed in the table at the foot of this webpage
The largest hydro-electric power station( Dinorwig) is located in Wales, has a generation capacity of 1.7GW.
This is a pumped water storage power station operated as a short-term-operating-reserve, or fast response plant
which is brought on line in response to short term rapid changes in power demand or sudden loss of power stations. This station
pumps water into a high level reservoir. The power to do this is derived from the grid during periods of low national demand. When
there is a sudden increased demand the water is allowed to flow back to a lower level reservoir generating power for the grid.
The UK national Electricity supply industry also includes a large number of wind powered generators grouped in farms in windy areas on land
and offshore in the seas around the UK coast.
Individual wind turbines are interconnected with a medium voltage (usually 34.5 kV) power collection
system and communications network. At a substation, this medium-voltage electrical current is increased in
voltage with a transformer for connection to the local high voltage transmission system. Construction of a wind farm
requires installation of the collector system and substation. Wind farms are generally located
near rural areas of comparative low local power loading. Voltage / power fluctuations resulting from wind speed/direction variation and start-up and shut
downs can be significant problems to the local power supplies in these regions.
As the present time (May 2011), there are about 292 operational wind farms in the UK, with 3 184 turbines and 5,3GW of installed capacity.
A further 3,9GW worth of schemes are currently under construction, and about 5.4 GW have planning consent and some 8.7GW are
in the process of planning awaiting approval. There is a growing utilisation of renewable resources in the UK but these are not
do not provide continuous reliable availability and there will be a continuing requirement for a combination of coal, gas and nuclear capacity.
There is an on-going argument as to the level of power back-up that is required for wind power generated supplies. The pessimistic view is that 80%- back-up is required.
Electrical Distribution system in UK
Most of the electrical power is transferred from the generators to the users via cables suspended from large engineered pylons.
These are aesthetically not pleasing but they are far cheaper than the alternative of underground cables which have to be provided with highly engineered
insulation to cater for the high voltages and the arduous conditions underground. The suspended high voltage cables are generally based on steel cores
surrounded with a layer of conducting aluminium . The cables are generally supported from the arms of the pylons with engineered insulators.
The diagram below shows the main principles of the UK
National grid system.
National Grid System.. Detailed download map showing UK Electrical Distribution System as of 2004
Users of electrical Power ..
Virtually all public electricity supplies are AC today.
Users of large amounts of DC power including electric railways, telephone exchanges and industrial processes such as
aluminium smelting usually either have adjacent dedicated generating equipment, or use rectifiers to derive DC from the public AC supply.
The electrical supplies to industrial users are invariably three phase. Three-phase supplies are essential for operating
heavy industrial equipment. A ground is normally provided, connected to conductive enclosure and other safety equipment, to keep current
away from equipment and people. The delivered voltage is supplied via step- down transformers
The standards 3 phase supply in the UK is 400 V -6% to +10% (376V and 440 V) . For many years the 3 Phase supply has been a nominal 415V supply.
In many areas, "delta" three phase service is common. Delta service has no distributed neutral
wire and is therefore less expensive. Ground is provided as a low resistance earth ground, sometimes attached to a synthetic
ground made by a transformer in a substation.
The standard nominal supply voltage in domestic single-phase 50 Hz installations in the UK is still 240V AC (RMS).
However, to conform with European codes, the official voltage is 230 V+10%-6% (216.2�253 V). There is a proposal to modify this
to 230 V �10% (207-253 V). .
Home Electric Systems ..
The electrical supply to a typical UK house is via an electricity board on which is mounted the meter which records
the quantity of electricity used and a consumer unit which includes a power main switch and fuses or circuit breakers for the
various circuits feeding the sockets and devices located around the home.
There are five different circuit types used in the typical domestic system
1) Ring circuit. This circuit starts from a (32 Amp) fuse/Circuit breaker and is routed round a chain of sockets and returns to the
supply point. Ring Circuit
2) Single appliance circuit...Routed directly to an appliance which is a large consumer of electricity such as a cooker or shower. This is normally
provided with a max. 30 amp fuse/breaker in the consumer unit. Single Appliance
3) A lighting circuit. There is normally one lighting circuit for a maximum of 10 lights . A lighting circuit is often provided for
all the lights on each floor of a house. A lighting circuit is normally provided with a 5 amp fuse/breaker. Lighting
4) The socket off a ring is generally a single or twin unit design to take a standard 3 pin plug. The plug has to be fitted with a 13amp or
3 amp fuse.
5) It is sometimes convenient to run a spur circuit off a socket to a single of double socket or a (max 13 amp)fused connected appliance.
|
Important: The above notes on a domestic system are only general in nature . Detailed requirements are found in the relevant regulations. (BS 7671: 2008, 17th Edition).;
Tables showing Power stations in UK
Total of UK generation Capacity in UK = 78GW (2009), maximum simultansous UK load 60 GW (2009)..Governemnt statistics (2010) ref
Department of Energy and Climate Change- Statistical Press Release 29/Jul/2010
These lists and totals do not include tidal power generators, and power stations /generators with
capacities less than 1 MW. The lists are based on information available on the internet on 25/05/2011. Stations are closing down
and new power stations / wind farms are being constructed over time and so these lists represent a rough snapshot of the situation at a set time.
Coal.....
Nuclear.....
Gas.....
Oil.....
Hydroelectric.....
Windpower - Offshore.....
Windpower - Onshore.....
Biomass.....
Coal Power Stations
Name |
Power(MW) |
Location |
Cottam Power Station |
2008 |
England |
Didcot A Power Station |
1958 |
England |
Drax power station |
3870 |
England |
Eggborough Power Station |
1950 |
England |
Ferrybridge Power Station |
1995 |
England |
Fiddlers Ferry Power Station |
1961 |
England |
Ironbridge Power Station |
970 |
England |
Kingsnorth power station |
1940 |
England |
Lynemouth Power Station |
420 |
England |
Ratcliffe-on-Soar Power Station |
2000 |
England |
Rugeley Power Station |
1006 |
England |
Tilbury Power Station |
1038 |
England |
West Burton Power Station |
1972 |
England |
Wilton Power Station |
197 |
England |
Cockenzie (Scot) |
1200 |
Scotland |
Longannet |
2400 |
Scotland |
Kilroot |
520 |
N.Ireland |
Total | 27.4GW | |
Note: Kilroot is a coal ,Oil and Bio-mass combined station.
Nuclear Power Stations
Name |
Power(MW) |
Location |
Dungeness B |
1080 |
England |
Harlepool Power Station |
1210 |
England |
Heysham -stage 1 |
1200 |
England |
Heysham stage 2 |
1200 |
England |
Hinkley Point B |
1260 |
England |
Oldbury Power Staion. |
470 |
England |
Sizewell B |
1190 |
England |
Hunterston B |
1288 |
Scotland |
Torness |
1364 |
Scotland |
Wylfa |
490 |
Wales |
Total | 10,7Gw | |
Gas Power Stations
Name |
Power(MW) |
Location |
Barking Reach power station |
1000 |
England |
Blackburn Mill |
60 |
England |
Bridgewater power station |
10 |
England |
Burghfield power station. |
45 |
England |
Chickerell power station. |
45 |
England |
Chippenham power station. |
10 |
England |
Corby Power Station. |
401 |
England |
Coryton Power Station. |
732 |
England |
Cottam Power Station. |
400 |
England |
Damhead Creek power station. |
792 |
England |
Derwent Power Station. |
214 |
England |
Didcot B Power Station. |
1390 |
England |
Enfield Power Station. |
92 |
England |
Fellside Power Station. |
80 |
England |
Glanford Brigg Power Station . |
68 |
England |
Great Yarmouth Power Station. |
20 |
England |
Immingham Power Station. |
730 |
England |
Keadby Power Station. |
45 |
England |
Killingholme Power Station.(Centrica) |
665 |
England |
Killingholme Power Station.(EON) |
900 |
England |
Kings Lynn Power Station. |
40 |
England |
Little Barford Power Station. |
65 |
England |
Langage Power Station. |
900 |
England |
Marchwood Power Station . |
40 |
England |
Medway Power Station. |
88 |
England |
Peterborough Power Station. |
05 |
England |
Rocksavage Power Station. |
748 |
England |
Roosecote Power Station. |
29 |
England |
Rye House Power Station. |
715 |
England |
Salt End power station. |
1200 |
England |
Seabank Power Station. |
145 |
England |
Seal Sands Power Station. |
50 |
England |
Sevington power station. |
10 |
England |
Shoreham Power Station. |
400 |
England |
Solutia power station. |
10 |
England |
South Humber Bank Power Station. |
1285 |
England |
Spalding Power Station. |
860 |
England |
Staythorpe Power Station. |
1650 |
England |
Sutton Bridge Power Station . |
800 |
England |
Taylors Lane Power Station. |
132 |
England |
Teesside power station. |
1875 |
England |
Weston Point CHP |
- |
England |
Wheldale power station. |
8 |
England |
Winnington Power Station. |
130 |
England |
Peterhead. (designed for oil) |
1550 (running on gas) |
Scotland. |
Total | 26GW | |
Oil Power Stations
Name |
Power(MW) |
Location |
Fawley Power Station |
968 |
England |
Grain Power Station |
1300 |
England |
Littlebrook D Power Station |
2055 |
England |
Total | 4,3GW | |
Hydro Electric Power Stations
Name |
Power(MW) |
Location |
Type |
Achanalt | 3 | Scotland | Conventional |
Aigas | 20 | Scotland | Conventional |
Allt-na-Lairige | 6 | Scotland | Conventional |
Bonnington | 11 | Scotland | Conventional |
Carsfad | 12 | Scotland | Conventional |
Cashlie | 11 | Scotland | Conventional |
Cassley | 10 | Scotland | Conventional |
Ceannacroc | 20 | Scotland | Conventional |
Chliostair | 1 | Scotland | Conventional |
Clachan | 40 | Scotland | Conventional |
Clunie | 61 | Scotland | Conventional |
Cuaich | 2.5 | Scotland | Conventional |
Cuileig | 3.2 | Scotland | Conventional |
Culligran | 19 | Scotland | Conventional |
Dalchonzie | 4 | Scotland | Conventional |
Deanie | 38 | Scotland | Conventional |
Drumjohn | 2 | Scotland | Conventional |
Earlstoun | 14 | Scotland | Conventional |
Errochty | 75 | Scotland | Conventional |
Fasnakyle | 69 | Scotland | Conventional |
Finlarig | 16.5 | Scotland | Conventional |
Foyers | 305 | Scotland | Conventional |
Foyers Falls | 5 | Scotland | Conventional |
Gaur | 7.5 | Scotland | Conventional |
Gisla | 1 | Scotland | Conventional |
Glenlee | 24 | Scotland | Conventional |
Glenmoriston | 37 | Scotland | Conventional |
Grudie Bridge | 18.7 | Scotland | Conventional |
Inverawe | 25 | Scotland | Conventional |
Invergarry | 20 | Scotland | Conventional |
Kendoon | 24 | Scotland | Conventional |
Kerry Falls | 1 | Scotland | Conventional |
Kilmelfort | 2 | Scotland | Conventional |
Kilmorack | 20 | Scotland | Conventional |
Kingairloch | 3.5 | Scotland | Conventional |
Kinlochleven | 30 | Scotland | Conventional |
Lairg | 3.5 | Scotland | Conventional |
Lednock | 3 | Scotland | Conventional |
Livishie | 15 | Scotland | Conventional |
Loch Dubh | 1.2 | Scotland | Conventional |
Loch Ericht | 2.2 | Scotland | Conventional |
Loch Gair | 6 | Scotland | Conventional |
Lochaber | 88 | Scotland | Conventional |
Lochay | 45 | Scotland | Conventional |
Lubreoch | 4 | Scotland | Conventional |
Luichart | 34 | Scotland | Conventional |
Lussa | 2.4 | Scotland | Conventional |
Morar | 1 | Scotland | Conventional |
Mossford | 18,7 | Scotland | Conventional |
Mullardoch | 2.4 | Scotland | Conventional |
Nant | 15 | Scotland | Conventional |
Nostie Bridge | 1 | Scotland | Conventional |
Orrin | 18 | Scotland | Conventional |
Pitlochry | 15 | Scotland | Conventional |
Quoich | 18 | Scotland | Conventional |
Rannoch | 44 | Scotland | Conventional |
Shin | 18.6 | Scotland | Conventional |
Sloy | 160 | Scotland | Conventional |
Sron Mor | 5 | Scotland | Conventional |
St Fillans | 16.8 | Scotland | Conventional |
Stonebyres | 5 | Scotland | Conventional |
Storr Lochs | 2.4 | Scotland | Conventional |
Striven | 8 | Scotland | Conventional |
Tongland | 33 | Scotland | Conventional |
Torr Achilty | 15 | Scotland | Conventional |
Trinafour | 0.5 | Scotland | Conventional |
Tummel Bridge | 34 | Scotland | Conventional |
Cruachan Dam | 400 | Scotland | Pumped Storage |
Foyers | 300 | Scotland | Pumped Stroage |
Beeston | 1,7 | England | River |
Kielder Water | 12 | England | Conventional |
Dinorwig | 1728 | Wales | Pumped Storage |
Dolgarrog | 18 | Wales | Pumped Storage |
Ffestiniog | 360 | Wales | Conventional |
Rheidol | 49 | Wales | Conventional |
Cwm Dyli | 10 | Wales | Conventional |
Maentwrog | 30 | Wales | Conventional |
Glendoe | 100 | Scotland | Conventional |
Total | 4,4GW | | |
Offshore Wind Farms
Name | Capacity MW | Location |
Barrow | 90 | England |
Beatrice | 10 | Scotland |
Blyth Offshore | 4 | England |
Burbo Bank | 90 | England |
Gunfleet Sands | 1 | 108 England |
Gunfleet Sands 2 | 64.8 | England |
Kentish Flats | 90 | England |
Lynn & Inner Dowsing | 194.4 | England |
North Hoyle | 60 | Wales |
Rhyl Flats | 90 | Wales |
Robin Rigg | 180 | Scotland |
Scroby Sands | 60 | England |
Thanet Offshore | 300 | England |
Totals | 1,3GW | |
Onshore Wind Farms
Name | Capacity MW | Location |
Milton Keynes | 14 | England |
Coldham | 16 | England |
Glass Moor | 16 | England |
McCains Foods | 9 | England |
Ransonmoor Farm | 6 | England |
Ransonmoor Farm Phase II | 4 | England |
Red Tile | 24 | England |
Stags Holt | 18 | England |
Bears Down | 9.6 | England |
Carland Cross | 6 | England |
Cold Northcott | 6.8 | England |
Delabole wind farm[1] | 4 | England |
Four Burrows | 4.5 | England |
Goonhilly Repowering | 12 | England |
St Breock | 4.95 | England |
WWF Roskrow Barton | 1.7 | England |
Broom Hill (includes Sunnyside) | 8 | England |
Hare Hill(3Hs) | 5.5 | England |
High Hedley Hope | 2.25 | England |
High Hedley Hope 2 | 5.2 | England |
High Volts (3Hs) | 8.25 | England |
Holmside Hall (3Hs) | 5.5 | England |
Langley Park/Long Edge | 8 | England |
Tow Law | 2.31 | England |
Trimdon Grange | 5.2 | England |
Walkway, High Swainston | 14 | England |
West Durham | 24 | England |
WWA High Sharpley | 2.6 | England |
Askam | 4.62 | England |
Eastman (Voridian) | 4 | England |
Great Orton II | 3.96 | England |
Harlock Hill | 2.5 | England |
Haverigg II | 2.4 | England |
Haverigg III | 3.4 | England |
Kirkby Moor | 4.8 | England |
Lambrigg | 6.5 | England |
Lowca | 4.62 | England |
Oldside | 5.4 | England |
Siddick | 4.2 | England |
Wharrels Hill | 10.4 | England |
Winscales Moor | 5.95 | England |
Winscales | 1.98 | England |
Winscales Extension | 6.8 | England |
WWU High Pow | 3.9 | England |
Forestmoor | 2.7 | England |
Lissett Airfield | 30 | England |
Bristol Port Wind Park Ltd | 6 | England |
Out Newton | 9.1 | England |
Little Cheyne Court | 59.8 | England |
Caton Moor Repowering | 16 | England |
Coal Clough | 9.6 | England |
Scout Moor | 65 | England |
WWP Hameldon Hill | 4.5 | England |
Bagmoor | 16 | England |
Bambers Farm | 4.8 | England |
Bambers Farm II | 4.8 | England |
Bicker Fen | 26 | England |
Conisholme Fen Resubmission | 16 | England |
Deeping St Nicholas | 16 | England |
Gedney Marsh (Red House) | 12 | England |
Mablethorpe | 1.2 | England |
The Hollies Wind Farm | 2.6 | England |
Dagenham | 3.6 | England |
Mersey Docks | 10 | England |
Royal Seaforth Dock | 3.6 | England |
Blood Hill | 2.25 | England |
North Pickenham Wind Farm | 14.4 | England |
Knabs Ridge, Felliscliffe | 16 | England |
Rusholme | 24 | England |
Burton Wold | 20 | England |
Blyth Harbour | 2.7 | England |
Kirkheaton | 1.8 | England |
Lindhurst Wind Farm | 9 | England |
Westmill | 6.5 | England |
Loscar | 4.5 | England |
Royd Moor | 6.5 | England |
Great Eppleton Repowering | 8.2 | England |
Nissan Motors Plant | 3.96 | England |
Chelker Reservoir | 1.2 | England |
Ovenden Moor | 9.2 | England |
Loftsome Bridge Water Treatment Works | 2.6 | England |
Garves Mountain/Dunloy | 15 | N.Ireland |
Corkey | 5 | N.Ireland |
Elliot�s Hill | 5 | N.Ireland |
Gruig | 25 | N.Ireland |
Wolf Bog | 10 | N.Ireland |
Callagheen | 16.9 | N.Ireland |
Slieve Rushen Repowering | 54 | N.Ireland |
Tappaghan Mountain | 19.5 | N.Ireland |
Tappaghan Mountain Extension | 9 | N.Ireland |
Altahullion Phase I | 26 | N.Ireland |
Altahullion Phase II | 11.7 | N.Ireland |
Rigged Hill | 5 | N.Ireland |
Bessy Bell | 5 | N.Ireland |
Bessy Bell Extension | 9 | N.Ireland |
Bin Mountain | 9 | N.Ireland |
Hunter's Hill | 20 | N.Ireland |
Lendrum�s Bridge Phase I | 5.94 | N.Ireland |
Lendrum�s Bridge Phase II | 7.3 | N.Ireland |
Lough Hill Resubmission | 7.8 | N.Ireland |
Owenreagh | 5 | N.Ireland |
Owenreagh Extension | 5.1 | N.Ireland |
Slieve Divena 1 | 30 | N.Ireland |
Boyndie Airfield | 14 | Scotland |
Boyndie Airfield Extension | 2.3 | Scotland |
Cairnmore | 2.55 | Scotland |
Dummuie | 10.4 | Scotland |
Glens of Foudland | 26 | Scotland |
Hill of Balquhindachy (Extension) | 1.7 | Scotland |
Hill of Eastertown | 2.55 | Scotland |
Hill of Fiddes | 6.9 | Scotland |
Hill of Skelmonae | 3.2 | Scotland |
House O Hill | 2.4 | Scotland |
North Redbog | 1.6 | Scotland |
St John's Wells | 2.4 | Scotland |
Strath of Brydock | 4.6 | Scotland |
Tullo | 17.5 | Scotland |
Upper Ardgrain | 2.4 | Scotland |
Ardkinglas/ Clachan Flats | 15.03 | Scotland |
Beinn an Tuirc | 30 | Scotland |
Beinn Ghlas | 8.4 | Scotland |
Cruach Mhor | 29.75 | Scotland |
Deucheran Hill | 15.75 | Scotland |
Tangy | 18.65 | Scotland |
Artfield Fell | 19.5 | Scotland |
Craig Wind Farm | 10 | Scotland |
Dalswinton, Pennyland Moor | 30 | Scotland |
Minsca | 36.8 | Scotland |
North Rhins | 22 | Scotland |
Wether Hill | 18.2 | Scotland |
Windy Standard | 21.6 | Scotland |
Michelin Tyre Factory | 4 | Scotland |
Hare Hill | 13.2 | Scotland |
Aikengall | 48 | Scotland |
Myres Hill | 1.9 | Scotland |
Whitelee[2], Eaglesham Moor | 322 | Scotland |
Achairn Farm, Stirkoke | 6.15 | Scotland |
Achany Estate | 38 | Scotland |
Beinn Tharsuinn | 29.75 | Scotland |
Beinn Tharsuinn Extension | 4.6 | Scotland |
Ben Aketil | 23 | Scotland |
Ben Aketil Extension | 4.6 | Scotland |
Bilbster (Watten) | 3.9 | Scotland |
Boulfruich | 13 | Scotland |
Causeymire | 48.3 | Scotland |
Edinbane | 41.4 | Scotland |
Fairburn Estate | 40 | Scotland |
Farr Wind Farm | 92 | Scotland |
Forss Extension | 5.2 | Scotland |
Forss, Hill of Lybster | 2 | Scotland |
Gigha Community | 0.68 | Scotland |
Kilbraur (Strathbrora) | 47.5 | Scotland |
Millennium (Glenmoriston) | 40 | Scotland |
Millennium Extension (Glenmoriston) | 10 | Scotland |
Novar | 17 | Scotland |
Findhorn Foundation | 0.75 | Scotland |
Findhorn Foundation Extension | 0.75 | Scotland |
Paul�s Hill | 64.4 | Scotland |
Rothes (Cairn Uish) | 50.6 | Scotland |
Ardrossan | 24 | Scotland |
Ardrossan Extension | 6 | Scotland |
Wardlaw Wood (Dalry Community Windfarm) | 18 | Scotland |
Hagshaw Hill Extension | 26 | Scotland |
Bu Farm | 2.7 | Scotland |
Burgar Hill | 5 | Scotland |
Hammars Hill | 4.5 | Scotland |
Spurness Wind Farm | 8.25 | Scotland |
Drumderg | 36.8 | Scotland |
Green Knowes | 27 | Scotland |
Toddleburn | 27.6 | Scotland |
Black Hill | 28.6 | Scotland |
Bowbeat | 31.2 | Scotland |
Carcant | 6 | Scotland |
Crystal Rig | 50 | Scotland |
Crystal Rig1a | 12.5 | Scotland |
Crystal Rig2 & 2a | 138 | Scotland |
Dun Law | 17.6 | Scotland |
Dun Law Extension | 29.75 | Scotland |
Long Park | 38 | Scotland |
Burradale Phase 1 | 1.98 | Scotland |
Burradale Phase 2 | 1.7 | Scotland |
Hadyard Hill, Barr | 120 | Scotland |
Black Law Phase I | 97 | Scotland |
Black Law Phase II | 27.6 | Scotland |
Greendykeside Wind Farm | 4 | Scotland |
Hagshaw Hill | 15.6 | Scotland |
Lochhead Farm | 6.15 | Scotland |
Braes of Doune | 72 | Scotland |
Burnfoot Hill | 26 | Scotland |
Craigengelt | 20 | Scotland |
Earlsburn | 37.5 | Scotland |
Pates Hill | 14 | Scotland |
Arnish Moor | 3.9 | Scotland |
Llyn Alaw | 20.4 | Wales |
Alltwalis (formerly Blaengwen) | 23 | Wales |
Blaen Bowi | 3.9 | Wales |
Parc Cynog | 3.6 | Wales |
Pendine (Parc Cynog Extension I) | 7.8 | Wales |
Cefn Croes | 58.5 | Wales |
Dyffryn Brodyn | 5.5 | Wales |
Llangwyryfon | 9.35 | Wales |
Mynydd Gorddu | 10.2 | Wales |
Rheidol | 2.4 | Wales |
Rhyd-y-Groes | 7.2 | Wales |
Moel Maelogen | 2.6 | Wales |
Moel Maelogen Extension | 11.7 | Wales |
Tir Mostyn & Foel Goch | 21.25 | Wales |
Wern Ddu (Craig Lelo) | 9.2 | Wales |
Braich Ddu Farm | 3.9 | Wales |
Hafoty Ucha 2 Extension | 1.7 | Wales |
Trysglwyn | 5.6 | Wales |
Ffynnon Oer | 32 | Wales |
Castle Pill Farm Repowering | 3.2 | Wales |
Solutia UK Ltd | 5 | Wales |
Bryn Titli | 9.9 | Wales |
Carno �A� & �B� | 33.6 | Wales |
Carno Extension | 15.6 | Wales |
Cemmaes | 15.3 | Wales |
Llandinam P&L | 30.9 | Wales |
Mynydd Clogau | 14.45 | Wales |
Taff Ely | 9 | Wales |
Total for whole UK | 3,7GW | |
Biomass Power Stations
Name | Capacity MW | Fuel MW | Location |
Ely power station | 38 | Straw/Gas | England |
Eye power station | 13 | Animal waste | England |
Eye Power Station | 12,7 | Poultry Litter | England |
Glanford Power Station | 13 | meat/Bone | England |
Thetford power station | 39 | Poultry Litter | England |
Wilton | 10,3 | | England |
Westfield | 9,8 | | Scot |
Stevens Croft | 40 | Wood | Scot |
Longlands Lane | 10 | Wood | Wales |
Total for whole UK | 0,19 GW | | |
|